Reg. Year

2025-04

Engine(cc)

-

Mlg(km)

13000

Fuel

BEV

Transm.

AT

Description
Availability Check:High-probability availability on 2026-04-12 Condition:Original factory paint! Contact your AutoCango Account Manager on WhatsApp/WeChat/Telegram for further vehicle detail investigation, pricing, and purchase support.
تفاصيل السيارة
Ref IDACU90219761SteeringLeft
Model CodeVKVRGPBody TypeSUV
Model Year2025Mlg(km)13000
Exterior ColorGrayFuelBEV
Engine-TransmissionAT
Drivetrain2WDBatt.Cap.(kWh)100
Range(km)780Motor Power(kW)310
Seats5Doors5
Dim.(mm)4825*1930*166615.52
Weight(kg)2320Max.Cap(kg)2810
ملحقات
  • Sun Roof
  • Leather Seat
  • Power Seat
  • Seat Heating
  • Seat Ventilation
  • Alloy Wheel
  • Power Window
  • Auto A/C
  • Driver Airbag
  • 360 Camera
  • Adaptive Cruise
  • Side Airbag
  • Power Steering
  • GPS
  • Parking Radar
  • Passenger Airbag
  • Bluetooth
  • Central Locking
  • Keyless Entry
  • Push Start
المواصفات المتعلقة بالسيارات

Brand

Zeekr

Series

7X

Model Year

2025

Engine

-

Engine Power (kW)

-

Battery capacity (kWh)

100

Transmission

AT

Fuel

BEV

Range (KM)

780

Motor Power (kW)

310

More Details
قطع غيار السيارات
2026-04-12AutoCango

2025 Zeekr 7X BEV 100KWH

MSRP ¥249,900

$25,818
Car Price Only

CST

استفسر الآن

WhatsAppWeChatTelegram
Total Price Calculator
EXWFCAFOBCFRCIF

Price Breakdown

+ Vehicle Price ($):25,818

+ Inspection Fee ($):95

+ Export Handling Fee ($):400

+ Domestic Transport Fee ($):0

+ Port Local Fee ($):0

+ AutoCango Service Fee ($):300

+ Banking Transfer Fee ($):50

+ Other Fee ($):0

= Total Price($): EXW 26,663

Only the vehicle price at its location and customs handling cost, without domestic logistics, containerization costs, or international freight. The buyer is responsible for all costs and risks involved in moving the vehicle from the its location to the final destination.

The price in the calculator is an estimated price; for the most accurate and up-to-date pricing, please inquire us.

2026-04-12AutoCango

2025 Zeekr 7X BEV 100KWH

MSRP ¥249,900

$25,818
Car Price Only

CST

Reg. Year

2025-04

Engine(cc)

-

Mlg(km)

13000

Fuel

BEV

Transm.

AT

Description
Availability Check:High-probability availability on 2026-04-12 Condition:Original factory paint! Contact your AutoCango Account Manager on WhatsApp/WeChat/Telegram for further vehicle detail investigation, pricing, and purchase support.

استفسر الآن

WhatsAppWeChatTelegram
تفاصيل السيارة
Ref IDACU90219761SteeringLeft
Model CodeVKVRGPBody TypeSUV
Model Year2025Mlg(km)13000
Exterior ColorGrayFuelBEV
Engine-TransmissionAT
Drivetrain2WDBatt.Cap.(kWh)100
Range(km)780Motor Power(kW)310
Seats5Doors5
Dim.(mm)4825*1930*166615.52
Weight(kg)2320Max.Cap(kg)2810
ملحقات
  • Sun Roof
  • Leather Seat
  • Power Seat
  • Seat Heating
  • Seat Ventilation
  • Alloy Wheel
  • Power Window
  • Auto A/C
  • Driver Airbag
  • 360 Camera
  • Adaptive Cruise
  • Side Airbag
  • Power Steering
  • GPS
  • Parking Radar
  • Passenger Airbag
  • Bluetooth
  • Central Locking
  • Keyless Entry
  • Push Start
Total Price Calculator
EXWFCAFOBCFRCIF

Price Breakdown

+ Vehicle Price ($):25,818

+ Inspection Fee ($):95

+ Export Handling Fee ($):400

+ Domestic Transport Fee ($):0

+ Port Local Fee ($):0

+ AutoCango Service Fee ($):300

+ Banking Transfer Fee ($):50

+ Other Fee ($):0

= Total Price($): EXW 26,663

Only the vehicle price at its location and customs handling cost, without domestic logistics, containerization costs, or international freight. The buyer is responsible for all costs and risks involved in moving the vehicle from the its location to the final destination.

The price in the calculator is an estimated price; for the most accurate and up-to-date pricing, please inquire us.

المواصفات المتعلقة بالسيارات

Brand

Zeekr

Series

7X

Model Year

2025

Engine

-

Engine Power (kW)

-

Battery capacity (kWh)

100

Transmission

AT

Fuel

BEV

Range (KM)

780

Motor Power (kW)

310

More Details
قطع غيار السيارات
0