Reg. Year

2023-05

Engine(cc)

1991

Mlg(km)

58000

Fuel

Petrol

Transm.

AT

Description
Availability Check:High-probability availability on 2026-03-05 Condition:Original vehicle, two panels repainted Contact your AutoCango Account Manager on WhatsApp/WeChat/Telegram for further vehicle detail investigation, pricing, and purchase support.
Détails du véhicule
Ref IDACU90042866SteeringLeft
Model CodeLGWDQBody TypeMPV
Model Year2023Mlg(km)58000
Exterior ColorBlackFuelPetrol
Engine2.0T 252HP L4TransmissionAT
Drivetrain2WDBatt.Cap.(kWh)-
Range(km)-Motor Power(kW)-
Seats7Doors5
Dim.(mm)5212*1893*182317.99
Weight(kg)2150Max.Cap(kg)2790
Accessoires
  • Sun Roof
  • Leather Seat
  • Power Seat
  • Seat Heating
  • Seat Ventilation
  • Alloy Wheel
  • Power Window
  • Auto A/C
  • ABS
  • Driver Airbag
  • 360 Camera
  • Adaptive Cruise
  • Side Airbag
  • Tire Pressure Monitor
  • ESP
  • Power Steering
  • GPS
  • Parking Radar
  • Passenger Airbag
  • Bluetooth
  • Central Locking
  • Keyless Entry
  • Push Start
Caractéristiques automobiles pertinentes

Brand

GAC Trumpchi

Series

M8

Model Year

2023

Engine

2.0T 252HP L4

Engine Power (kW)

1991

Battery capacity (kWh)

-

Transmission

AT

Fuel

Petrol

Range (KM)

-

Motor Power (kW)

-

More Details
2026-03-05AutoCango

2023 GAC Trumpchi M8 2.0T 252HP L4 8AT

MSRP ¥289,800

$26,087

Car Price Only

CST

Guangzhou Guangdong China

SID:OAC968

Demander maintenant

WhatsAppWeChatTelegram
Total Price Calculator
EXWFCAFOBCFRCIF

Price Breakdown

+ Vehicle Price ($):26,087

+ Inspection Fee ($):65

+ Export Handling Fee ($):400

+ Domestic Transport Fee ($):0

+ Port Local Fee ($):0

+ AutoCango Service Fee ($):300

+ Banking Transfer Fee ($):50

+ Other Fee ($):0

= Total Price($): EXW 26,902

Only the vehicle price at its location and customs handling cost, without domestic logistics, containerization costs, or international freight. The buyer is responsible for all costs and risks involved in moving the vehicle from the its location to the final destination.

The price in the calculator is an estimated price; for the most accurate and up-to-date pricing, please inquire us.

0