Reg. Year

2026-01

Engine(cc)

-

Mlg(km)

3000

Fuel

BEV

Transm.

AT

Description
Availability Check:High-probability availability on 2026-03-31 Condition:60-degree electric rental. Specific vehicle configuration and other information are subject to the actual vehicle! Contact your AutoCango Account Manager on WhatsApp/WeChat/Telegram for further vehicle detail investigation, pricing, and purchase support.
Détails du véhicule
Ref IDACU90164830SteeringLeft
Model CodeNYXG4EBody TypeSUV
Model Year2025Mlg(km)3000
Exterior ColorWhiteFuelBEV
Engine-TransmissionAT
Drivetrain2WDBatt.Cap.(kWh)-
Range(km)560Motor Power(kW)240
Seats5Doors5
Dim.(mm)4828*1930*161615.06
Weight(kg)1885Max.Cap(kg)2320
Accessoires
  • Sun Roof
  • Leather Seat
  • Power Seat
  • Seat Heating
  • Seat Ventilation
  • Alloy Wheel
  • Power Window
  • Auto A/C
  • Driver Airbag
  • 360 Camera
  • Adaptive Cruise
  • Side Airbag
  • Power Steering
  • HUD
  • GPS
  • Parking Radar
  • Passenger Airbag
  • Bluetooth
  • Central Locking
  • Keyless Entry
  • Push Start
Caractéristiques automobiles pertinentes

Brand

ONVO

Series

L60

Model Year

2025

Engine

-

Engine Power (kW)

-

Battery capacity (kWh)

-

Transmission

AT

Fuel

BEV

Range (KM)

560

Motor Power (kW)

240

More Details
2026-03-31AutoCango

2025 ONVO L60 BEV

MSRP ¥206,900

$18,779
Car Price Only

CST

Hangzhou Zhejiang China

SID:OAC968

Demander maintenant

WhatsAppWeChatTelegram
Total Price Calculator
EXWFCAFOBCFRCIF

Price Breakdown

+ Vehicle Price ($):18,779

+ Inspection Fee ($):95

+ Export Handling Fee ($):400

+ Domestic Transport Fee ($):0

+ Port Local Fee ($):0

+ AutoCango Service Fee ($):300

+ Banking Transfer Fee ($):50

+ Other Fee ($):0

= Total Price($): EXW 19,624

Only the vehicle price at its location and customs handling cost, without domestic logistics, containerization costs, or international freight. The buyer is responsible for all costs and risks involved in moving the vehicle from the its location to the final destination.

The price in the calculator is an estimated price; for the most accurate and up-to-date pricing, please inquire us.

2026-03-31AutoCango

2025 ONVO L60 BEV

MSRP ¥206,900

$18,779
Car Price Only

CST

Reg. Year

2026-01

Engine(cc)

-

Mlg(km)

3000

Fuel

BEV

Transm.

AT

Description
Availability Check:High-probability availability on 2026-03-31 Condition:60-degree electric rental. Specific vehicle configuration and other information are subject to the actual vehicle! Contact your AutoCango Account Manager on WhatsApp/WeChat/Telegram for further vehicle detail investigation, pricing, and purchase support.

Demander maintenant

WhatsAppWeChatTelegram

Hangzhou Zhejiang China

SID:OAC968
Détails du véhicule
Ref IDACU90164830SteeringLeft
Model CodeNYXG4EBody TypeSUV
Model Year2025Mlg(km)3000
Exterior ColorWhiteFuelBEV
Engine-TransmissionAT
Drivetrain2WDBatt.Cap.(kWh)-
Range(km)560Motor Power(kW)240
Seats5Doors5
Dim.(mm)4828*1930*161615.06
Weight(kg)1885Max.Cap(kg)2320
Accessoires
  • Sun Roof
  • Leather Seat
  • Power Seat
  • Seat Heating
  • Seat Ventilation
  • Alloy Wheel
  • Power Window
  • Auto A/C
  • Driver Airbag
  • 360 Camera
  • Adaptive Cruise
  • Side Airbag
  • Power Steering
  • HUD
  • GPS
  • Parking Radar
  • Passenger Airbag
  • Bluetooth
  • Central Locking
  • Keyless Entry
  • Push Start
Total Price Calculator
EXWFCAFOBCFRCIF

Price Breakdown

+ Vehicle Price ($):18,779

+ Inspection Fee ($):95

+ Export Handling Fee ($):400

+ Domestic Transport Fee ($):0

+ Port Local Fee ($):0

+ AutoCango Service Fee ($):300

+ Banking Transfer Fee ($):50

+ Other Fee ($):0

= Total Price($): EXW 19,624

Only the vehicle price at its location and customs handling cost, without domestic logistics, containerization costs, or international freight. The buyer is responsible for all costs and risks involved in moving the vehicle from the its location to the final destination.

The price in the calculator is an estimated price; for the most accurate and up-to-date pricing, please inquire us.

Caractéristiques automobiles pertinentes

Brand

ONVO

Series

L60

Model Year

2025

Engine

-

Engine Power (kW)

-

Battery capacity (kWh)

-

Transmission

AT

Fuel

BEV

Range (KM)

560

Motor Power (kW)

240

More Details
0