Reg. Year

2024-01

Engine(cc)

1991

Mlg(km)

40700

Fuel

Petrol

Transm.

AT

Vehicle Details
Ref IDACU5698284SteeringLeft
Model Code99XYDBody TypeSUV
Model Year2024Mlg(km)40700
Exterior ColorWhiteFuelPetrol
Engine2.0T 252HP L4TransmissionAT
Drivetrain2WDBatt.Cap.(kWh)-
Range(km)-Motor Power(kW)-
Seats7Doors5
Dim.(mm)4980*1950*178017.29
Weight(kg)1920Max.Cap(kg)2460
Accessories
  • Sun Roof
  • Leather Seat
  • Power Seat
  • Seat Heating
  • Alloy Wheel
  • Power Window
  • Auto A/C
  • ABS
  • Driver Airbag
  • 360 Camera
  • Adaptive Cruise
  • Side Airbag
  • Tire Pressure Monitor
  • Spare Tire
  • ESP
  • Power Steering
  • GPS
  • Parking Radar
  • Passenger Airbag
  • Bluetooth
  • Central Locking
  • Keyless Entry
  • Push Start
Relevant Car Specs

Brand

GAC Trumpchi

Series

GS8

Model Year

2024

Engine

2.0T 252HP L4

Engine Power (kW)

1991

Battery capacity (kWh)

-

Transmission

AT

Fuel

Petrol

Range (KM)

-

Motor Power (kW)

-

More Details
2026-02-11

2024 GAC Trumpchi GS8 2.0T 252HP L4 8AT

MSRP ¥186,800

$20,501

CST

Baoding Hebei China

SID:WJP858

Inquire Now

WhatsAppWeChatTelegram
Total Price Calculator
EXWFCAFOBCFRCIF

Price Breakdown

+ Vehicle Price ($):20,501

+ Inspection Fee ($):65

+ Export Handling Fee ($):400

+ Domestic Transport Fee ($):0

+ Port Local Fee ($):0

+ AutoCango Service Fee ($):300

+ Banking Transfer Fee ($):50

+ Other Fee ($):0

= Total Price($): EXW 21,316

Only the vehicle price at its location and customs handling cost, without domestic logistics, containerization costs, or international freight. The buyer is responsible for all costs and risks involved in moving the vehicle from the its location to the final destination.

The price in the calculator is an estimated price; for the most accurate and up-to-date pricing, please inquire us.

0